Posts Tagged ‘Massey Tunnel’
Geography and demographics perpetually conspire against Delta
There is a piece by Justin McElroy of the CBC that discusses transit – or rather the lack of it – south of the Fraser and in particular – in Delta. As usual this is in the context of the Massey Tunnel. And I found myself irritated by McElroy’s journalistic attitude. Which is a shame since I generally enjoy reading his stuff.
He has got some data that he puts into Infograms – but the one thing that is very obviously missing is this map
The original is a pdf that you can get from metrovancouver. It is the second one in the list. Most of Delta is either agricultural or the protected area of Burns Bog. The only population centres are Ladner and “North Delta” – the bit of Surrey that flops over the municipal boundary in the northeast corner.
“Strip away the urban studies jargon,” says McElroy – which is frankly offensive. What Kevin Desmond says is simple and obvious. But what would have made it clearer is if the article had included this map. The relationship between transit service and residential density is very basic and very clear. Though what is a bit of a surprise is that Tsawwassen does not even show up on this map. It is not labelled but does show the “urban containment boundary” – and is still pale green , not the orange of the next density step up. I am not sure if the next census is going to be much different – or if it will show the Tsawwassen FN as a separate “municipality”. But then White Rock doesn’t get a label either though Semiahmoo does. But that is because the labels refer to “Regional and Municipal Centres”.
And actually the lack of transit in this region is nothing to do with geography or demographics. It is simply politics. For 16 years we had a provincial government that neglected transit except for a its pet megaprojects – and foisted an unnecessarily divisive referendum on transit funding which has held back service growth. That log jam has now been broken and things are getting better slowly, but clearly priority for new service has to go to where overcrowding is worst. The province is still fumbling over the need for better regional connections because MoTI is still run by traffic engineers keen to build more and bigger roads. Everyone else seems to understand induced traffic, and the only real argument seems to be over transit technology – which is actually much less important than transit priority.
And while I think there is improvement, we have by no means solved the underfunding of transit operations and maintenance. Senior governments only want to fund projects that have nice photo-ops for politicians, not the dull but essential everyday need to keep the fleet running. Which makes me even less tolerant of the people who keep pushing the idea of free transit, as though we did not already have enough issues of overcrowding and pass-ups. If we had lots of spare capacity and the ability to replace fare revenue from some other source I might be more receptive, but these never ever get mentioned by the free fare crowd. They seem to think that somehow not collecting fares actually saves money, which is not true here – and is only true is very small, underutilized systems – mostly in the US. If you really want public services to be free please concentrate on health and education – which are supposedly free but are not by a long way. When you do not need health insurance for any treatment, and anyone can go to post secondary education without needing loans or grants or scholarships, then I will accept that free transit can be next up. But recognize that means making wealthy people pay more taxes. As we have seen with property tax, you can expect pretty hard push back.
Guest Post: There is no bridge design
Susan Jones, of Fraser Voices has sent this letter to NDP MLAs with copies to the press. She has also given permission for it to be posted to social media
Thank you for canceling construction of the bridge to replace the George Massey Tunnel. The media are erroneously reporting that the technical work has been done on the planned bridge to replace the Massey Tunnel. In fact the numerous documents posted by the B.C. Liberal Government are mainly literature compilations and descriptive information.
There is no bridge design. There is only a preliminary, conceptual plan for the bridge. The six geotechnical reports are mainly a collection of available information. The Geotechnical Data Report, posted February, 2017, contains test-hole data and laboratory investigations which do not include “project design requirements” and “cannot guarantee or warranty that the geotechnical information obtained is sufficient to fully satisfy the project objectives or requirements.”[i]
There is no evidence that a bridge can be safely constructed at this location. Without data and evidence, it is not possible to calculate the cost of the bridge. In fact, evidence collected to date confirms that the soils in location of the planned bridge are liquefiable sand and silt to great depths. Any bridge supports would need to be deep pile foundations. It they can be built at all, they would be exorbitantly expensive due to depth requirements and massive lateral structures.
The geotechnical information available to the public is accompanied by a disqualifier:
“The contents of this memorandum are not sufficient nor detailed enough for the final design, and should not be relied upon for the final design, for bidding purposes or for construction.”[ii]
Yet the B.C. Liberals were planning to award contracts in the summer of 2017.
The option of upgrading the existing tunnel and sinking a second tube was not credibly pursued by the B.C. Liberals. In April, 2013, Tunnel Engineering Consultations (TEC) from the Netherlands came to consult with the B.C. Ministry of Transportation.[iii] No written report of this consultation has been provided to the public in spite of Freedom of Information requests. It appears the BC Government did not request formal input. I suggest the B.C. Government contact TEC and request further consultation.
Thank you again for planning to review the project. Unfortunately, it is politically difficult as the tunnel congestion is a controversial issue that needs to be addressed effectively.
Sincerely,
Susan Jones
References:
[i] February 9, 2017: GEOTECHNICAL DATA REPORT – OAK STREET BRIDGE TO LADNER TRUNK ROAD George Massey Tunnel Replacement Project, Scrolled page 3/324
https://engage.gov.bc.ca/app/uploads/sites/52/2017/04/Technical-Background-Geotech-1.pdf
[ii] February 9, 2017: GEOTECHNICAL DATA REPORT – OAK STREET BRIDGE TO LADNER TRUNK ROAD George Massey Tunnel Replacement Project, Scrolled page 203/324
https://engage.gov.bc.ca/app/uploads/sites/52/2017/04/Technical-Background-Geotech-1.pdf
[iii] Planning Chronology for Massey Tunnel Replacement, Fact Sheet B.C. Government News, Sept. 13, 2016
https://news.gov.bc.ca/factsheets/planning-chronology-for-massey-tunnel-replacement
cc: B.C. Government NDP MLAs
Mayor and Council, City of Richmond
Mayor and Council, Corporation of Delta
Vancouver Sun
Vancouver Province
Delta Optimist
Richmond News
Surrey Leader Now
Peace Arch News
CityHallWatch
The Massey Bridge has been cancelled
The BC government has announced that it will conduct independent review to find best solution for George Massey corridor.
The following is the text of the press release
The Ministry of Transportation and Infrastructure is proceeding with an independent technical review of the George Massey Tunnel corridor to find a solution that gets people and goods moving and makes sense for commuters across the region.
The ministry is in the process of recruiting the individual to lead the technical review, and will support the review with expertise in highway infrastructure construction, transportation planning and traffic engineering.
The review will focus on what level of improvement is needed in the context of regional and provincial planning, growth and vision, as well as which option would be best for the corridor, be it the proposed 10-lane bridge, a smaller bridge or tunnel.
The Province’s work on the project, up to this point, will be looked at closely as part of the independent review, including technical information developed by the project team and from Metro Vancouver municipalities, as well as new analysis that includes looking at how the removal of tolls will affect the crossing.
While the review is underway, Transportation and Infrastructure Minister Claire Trevena will engage mayors from Metro Vancouver, including Richmond and Delta, to gather their perspectives on the project, and to ensure that any plan for this corridor reflects their ideas and fits into the overall vision for the region.
Based on the recommendations received, the Province will determine next steps to address the congestion along the Highway 99 corridor.
Pending the outcome of the review, the current procurement process has been cancelled and the project will not be budgeted for in the government’s capital plan until a solution has been identified. The terms of the request for proposals dictate that each of the two final bidding teams will be paid up to $2 million to help offset their expenses to date.
The Province has spent approximately $66 million on the estimated $3.5-billion project. BC Hydro has spent approximately $25 million on its transmission relocation project. Work completed to date is expected to be utilized regardless of which option is chosen. Valuable property has been acquired, pre-load construction work along the Highway 99 corridor is wrapping up, and technical work and analysis will be considered as government moves forward to improve the crossing.
Emphasis added
That $3bn Bridge will be $12bn
The following is the text of an NDP Press Release dated May 5
Documents show Clark’s Massey Bridge boondoggle will cost $12 billion
Construction costs for Christy Clark’s Massey toll bridge are mounting. After first claiming the bridge would cost $3 billion to build, estimates have already risen to $3.5 billion. And with reports that they are having difficulty finding bedrock, these costs are expected to climb further.
Because Christy Clark is pushing the bridge with no financial support from the federal or municipal governments, BC taxpayers will be left footing the whole bill.
Several months ago, the BC NDP filed a freedom of information request to find out the full cost of the project, including financing. The request came back with all financial details blanked out. (FOI documents).
But leaked internal documents (available here) reveal that financing costs for the bridge will add another $8 billion in costs that British Columbians will be paying for the next 50 years – bringing the total bill to nearly $12 billion.
We’ve already seen the frustration and traffic chaos caused by tolling the Port Mann Bridge. Christy Clark’s Massey scheme would cause similar problems on the Oak Street Bridge and area roads.
Why are the BC Liberals asking British Columbians to pay nearly $12 billion for a new toll bridge scheme that nobody wants?
Fraser Voices Press Release
In the wake of Christy Clark sending a letter to Justin Trudeau suggesting a tax on US coal exports through Vancouver would be an appropriate response to the softwood lumber tariff
Actually this lady beat her to it
No Coal Makes Way for a Cheaper, Faster, Safer Second Tunnel
No need for $4 billion Boondoggle Bridge
After years of ignoring thousands of people complaining about the impacts of US thermal coal through the Lower Fraser Delta, Premier Christy Clark is finally acknowledging that the coal is “not good for the environment.”
Now she is asking Prime Minister Trudeau to ban the export of thermal coal. No matter how he responds, the public now expects the B.C. Government to stop plans of Fraser Surrey Docks to export US thermal coal.
The reason for the largest, most expensive bridge ever built in B.C. is to remove the George Massey Tunnel, dredge the Fraser deeper and facilitate export of US thermal coal through Fraser Surrey Docks.
Plans also include transport of dangerous jet fuel and LNG on Panamax vessels and LNG carriers on the Fraser for the first time in history. As Canada has no effective laws, these projects do not meet international safety standards.
With no need for coal freighters, the public should demand that the B.C. Government revive the original plans to upgrade the George Massey Tunnel and build a second tunnel by immersing a second tube. This would be cheaper, faster, and safer.
Cheaper: Bridge: $3.5 to $6 billion Tunnel: $1 to $2 billion
Faster: Bridge: 5 to 6 years Tunnel: 2 to 3 years
Safer: During seismic activity: “Underground structures suffer minor damage compared to aboveground structures.”
(Tunnel under seismic loading: a review of damage case histories and protection methods, page 24)
ENGOS, Journalists and Politicians
“… politicians (other than all local mayors except one) simply have done little to challenge this $3.5 Billion boondoggle when another tunnel at less than 1/4 the coast is the best alternative to protect the fragile lower Fraser River.
The issue is mainly about building a bridge that will allow large freighters and tankers up the river after the tunnel is removed and that will be a very large nail into the coffin of the Lower Fraser in that it will be followed by Port Vancouver’s grandiose plans to industrialize the estuary and lower river.
This and the Roberts Bank Terminal 2 project will be the modern era’s beginning of the final degradation process of the last significant biological values in this globally significant river and estuary. It is time that the federal Trudeau Ministers did stand up and take notice of an out of control Port Vancouver and a total lack of and or proper CEAA assessment of such large projects affecting many federal values.”
Otto Langer Fisheries Biologist
Background
The B.C. Government triple-deleted all information on how they changed plans from a twinned tunnel to a massive bridge. Freedom of information requests from the public and MLA Vicki Huntington yielded a response of:
“Although a thorough search was conducted, no records were located in response to your request.”
However, a FOI request from Voters Taking Action on Climate Change revealed that from 2012 to 2014, the B.C. Liberals had ongoing discussions and correspondence with the federal government, the Port of Vancouver, Fraser Surrey Docks and vested interests.
Debunking MoTI again
On April 1, the provincial government put out a Fact Sheet claiming that a cable stayed bridge can be built on the silt and mud of the current tunnel site. I have expressed my doubts before, but it is now claimed that new engineering techniques will allow a bridge to be built now that were not available at the time a tunnel was chosen. I am not an engineer, so I am willing to defer to those with expertise in that field. What I am qualified to say is that a bridge is not necessary to solve the current traffic congestion, and that adding transit capacity in this corridor is the only way to ensure that the present problem of delays can be resolved. Simply moving them elsewhere solves nothing, and encouraging more trips by cars is not doing us any favours either. Removing the tunnel might suit the ambitions of the Port of Vancouver but there is no acknowledgement by the Province that this includes increasing the depth of the ship channel. And, so far as I can tell, the disastrous impact that would have on the ecology of the estuary has not even been adequately assessed, let alone the idea that it could somehow be mitigated
The rest of this post is by Tom Morrison – and I will let it speak for itself
Re: Massey Tunnel Replacement Bridge Fact Sheet
I read with interest the Massey Tunnel replacement bridge fact sheet, originating with MoTI and published in The Delta Optimist. It suffers from a certain lack of precision which this letter will attempt to remedy.
The logs of the two boreholes drilled to 335 metres from surface for the Massey Tunnel replacement bridge show only sand and silt, with decomposed organic material as far as 280 metres from surface, ranging from 20% to 50% water content. While the boreholes did encounter layers of stiff, dense material, core recovery ranged erratically with depth from 100% down to as little as 0%, the missing material being so soft that it was not recovered in the coring tube. The question that I posed some time ago: “Given the foundation conditions, can a bridge be built at reasonable cost, if at all?” remains unanswered, beyond the obvious fact that you can build (almost) anything, provided you spend enough (taxpayer) money doing so.
Before the Massey Tunnel was built, Crippen Wright Engineering wrote the following report:
Crippen Wright Engineering Ltd. Comparative Report on Fraser River Bridge and Tunnel Crossings at Deas Island. December 1955
Page 5: “Surface and subsurface investigations show that the site is well suited to the construction of a tunnel.”
Page 6: “Subsurface investigations disclose soil with relatively low load bearing characteristics, and there is no bed rock at practicable depths; the foundations for the main piers will require an extensive pile driving program.”
Page 8: “Bridge piers and anchors will require very expensive foundations since there is no bed rock or other good bearing material at any practicable depth.”
The report did not say that a bridge could not be built, just that it would be very expensive to do so. The foundation conditions were one reason, among many, why a tunnel was chosen instead of a bridge.
The fact sheet points to other bridges built nearby:
The Alex Fraser bridge.
Bazett, D.J., McCammon, N.R. Foundations of the Annacis cable-stayed bridge. Canadian Geotechnical Journal, Volume 23, No. 4, 1986, reads as follows:
Page 461: “On the south side, the stratigraphic sequence consists of glacial and interglacial sediments at least l00 m thick, which have been overridden by at least one of the major glaciers. They are hard or very dense and form good foundation bearing materials.”
“In sharp contrast, the north bank subsurface deposits consist of approximately 65 m of postglacial sediments resting unconformally on late glacial and older glacial marine sediments.”
Figure 3 shows the north tower as built on piles bottoming in layered material described as:
“Glaciomarine and marine sediments. Stiff to hard. Grey clayey silt interbedded with stony equivalents up to 4 m thick and layers of gravelly sand.”
And
“Subaqueous glaciofluvial sediments. Very stiff to hard, dense grey silt, sandy silt, clayey silt, and silty sand grading into medium to coarse sand with thin layers of gravel at depth.”
This contrasts with the 335+ metres of sand and silt encountered at the Massey Tunnel replacement bridge site.
The first Port Mann bridge.
The first Port Mann bridge was a 4-lane structure, opened in 1964.
See Golder, H. Q., Willeumier, G. C. Design of the Main Foundations of the Port Mann Bridge. Engineering Institute of Canada, 1964.
Page 1: “On the south side of the river the soil conditions were worse than on the north side and consisted of a layer of soft peat to a depth of 15 ft. overlying soft organic silts and clay silts down to about 40 ft., below this again was a compact peat underlain by clay to a depth of from 45 to50 ft. Layers of sand of varying density, with occasional layers of silt extended down to a depth of about 110 ft. and below this was gravel and sand to 120 ft. depth. From a depth of 120 ft. to 190 ft. the soil consisted of soft to firm sensitive clays and silts with occasional sand partings. Below this was compact granular material, some of which was till or till-like and some of which was probably waterlaid sands and silts which had been loaded by ice in the past.
“Whatever the actual geological history of this material, for the purposes of this paper it is referred to as “the till” or “the till-like material.” Artesian water pressure existed in some of the lower gravel layers. The foundation problem for the bridge stopped when the till-like material was reached.
“On the north side of the river the conditions were simpler consisting of a thick sand layer overlain by some compressible material and overlying a clay layer of some 60 ft. thick. Below this was the till-like material.”
Till, also known as glacial till or boulder clay, is defined (McGraw Hill Dictionary of Architecture and Construction, 2003.) as:
“An unstratified glacial deposit which consists of pockets of clay, gravel, sand, silt, and boulders; has not been subject to the sorting action of water; usually has good load-sustaining properties.”
This contrasts with the 1,100 ft. of sand and silt encountered at the Massey Tunnel replacement bridge site, from which till is notably absent.
The new Port Mann bridge.
The new, 10-lane Port Mann bridge opened in 2012.
A web note by International Bridge Technologies, Inc. has this to say:
“Foundations for the new Port Mann Bridge are generally 1.8-m (5.9-ft) steel piles or drilled shafts, supported on a firm ground till layer under the loose sand deposits at a depth below the river.”
The Pitt River bridge.
The 6-lane Pitt River bridge was opened in 2009.
International Bridge Technologies, Inc. The Pitt River Bridge. 2011, reports:
Page 5: “The geotechnical conditions at the site were not favorable. As expected in and around the river, deep layers of soft soil were present. The firm till layer existed some 30m below the mudline. While it could be shown that skin friction had the ability to carry the vertical loads of the bridge, the Owner stipulated that the piles be embedded into the till.”
This contrasts with the 335+ metres of sand and silt encountered at the Massey Tunnel replacement bridge site, from which till is notably absent.
Also:
Sorenson, J. New Pitt River bridge pier pilings push envelope. Journal of Commerce, August 15, 2007.
“The construction of the pilings supporting the piers for the new Pitt River bridge will push the envelope for British Columbia bridge construction, says project manager Ross Gilmour of Peter Kiewet Sons Ltd.
“Pilings are being driven to a depth of 100 metres to support the piers for the new bridge. By comparison, the depth of piers driven for the existing bridge was 60 metres.
“The construction of the pilings supporting the piers for the new Pitt River bridge will be pushing the envelope from what is normally seen in B.C. bridge construction, says Peter Kiewet Sons Ltd. project manager Ross Gilmour. ‘For piles of this size and the depth to which they are being driven, for all intensive purposes, we are pushing the envelope of what has been done. It is not the biggest pipe or the deepest in the world but it is on the edge of the envelope,’ he says.”
“Gilmour says pilings for the new bridge are being driven to a depth of 100 metres to support the piers for the new bridge. By comparison, the depth of piers driven for the existing bridge was 60 metres. (The new Golden Ears Bridge connecting Langley to Maple Ridge has piers driven to a 90 metre depth across the larger Fraser River).
“ ‘I wasn’t here then,’ he says, when the existing Pitt River bridge was constructed, but, he guesses that technology had not advanced to drive piles deeper during the 1970s. (Over the years, there has been some noted sinking of the existing bridge structure.) Gilmour says that the area in which the Pitt River bridge sits is mainly clays and silts, which vary in depths throughout the Fraser Valley. “What it means is that there is nothing solid to get a foundation on until we get to that (100 metre) depth,” he says. Exploratory drilling has been done to ensure the foundation material exists at that level and is suitable.”
No such foundation material is evident in the 335-metre boreholes drilled on the site of the George Massey Tunnel replacement bridge.
The Golden Ears bridge.
The 6-lane Golden Ears bridge was opened in 2009.
See Yang, D., Naesgaard, E., Byrne, P. M. Soil-Structure Interaction Considerations In Seismic Design For Deep Bridge Foundations. 6th International Conference on Case Histories in Geotechnical Engineering, Arlington, VA, August, 2008.
Page 2: “The subsoil conditions at the main river crossing consist of loose to medium dense sands, up to 35m thick on the south bank of the Fraser River and typically 20m thick within the river channel, resting upon normally consolidated to lightly over-consolidated clays and silts extending to the bottom of the deepest test holes drilled up to 120m below the ground surface.”
No such foundation material is evident in the 335-metre boreholes drilled on the site of the George Massey Tunnel replacement bridge.
The fact sheet refers to the 6-lane Sutong bridge in China, opened in 2008.
See Bittner, R. B., Safaqah, O., Zhang, X., Jensen, O. J. Design and Construction of the Sutong Bridge Foundations. DFI Journal, Volume 1, No. 1, November, 2007.
Page 4: “The soils at the pylon site consist mainly of firm to stiff CL clay extending to elevation -45m followed by layers of medium to very dense fine to coarse sands and silty sands with occasional loam layers. Bedrock is located at approximately 240 m below riverbed.”
This contrasts with the 335+ metres of sand and silt encountered at the Massey Tunnel replacement bridge site.
The fact sheet refers to the 4-lane Rion Antirion bridge in Greece, opened in 2004.
See Biesiadecki, G. L., Dobry, R., Leventis, G. E., Peck, R. B. Rion – Antirion Bridge Foundations: a Blend of Design and Construction Innovation. Fifth International Conference on Case Histories in Geotechnical Engineering, New York, April, 2004.
Page 4: Figure 5. Generalized Soil Profile, shows borings going to 160 metres below sea level intersecting 30-80% clay layers, the balance being sand and silt. This material may be more favourable to foundation construction than the 335+ metres of sand and silt encountered at the Massey tunnel replacement bridge.
The fact sheet refers to the Jamuna River bridge, Bangladesh – 4 lanes plus railroad, opened 1998.
See Barr, J. M., Farooq, A., Guest, S. Foundations of the Jamuna Bridge: design and construction. ETH, Zurich, 1999.
Page 250: “The site lies in the Bengal geosyncline which is continually subsiding, leading to the deposition of sediments brought down from the upper reaches. At Sirajganj the depth to basement rock is as much as 6km.”
However:
“Soil investigations undertaken between 1986 and 1988 during Phases I and II of the Feasibility Studies approximately 1 km from the final alignment showed recent alluvial silty sands, loose at the surface becoming medium dense with gravelly layers below a depth of about 50m extending to about 100m where hard silty clay overlies a dense mica silt.”
This contrasts with the 335+ metres of sand and silt encountered at the Massey Tunnel replacement bridge site.
The fact sheet cites: “Numerous major bridges over the Mississippi River in the United States.”
Taking one at random, let us look at the I-70 bridge at St. Louis, MO.
Geotechnical Report, I-70 Mississippi River Bridge, Volume I – Engineering Report, St. Louis, Missouri – East St. Louis, Illinois. Missouri Dept. of Transportation, Job No. J6i0984, Missouri Dept. of Transportation Bridge No. A6500.
Page 6. “While the bedrock is exposed in the Illinois bluffs several miles away, none outcrops in the project area. The bedrock surface ranges from 10 to 40 feet below the surface on the Missouri upper bank to 70 feet at the west bank, then slopes downward eastward along the project to a depth of 130 feet near Illinois Route 3.”
This bridge site is underlain by shallow bedrock.
The 6-lane Biloxi Bay replacement bridge was built in the more challenging conditions of the Mississippi delta in 2007.
See Thompson, W. R., Held, L., Saye, S. Test Pile Program to Determine Axial Capacity and Pile Setup for the Biloxi Bay Bridge. DFI Journal, Vol. 3 No. 1, May 2009
Page 14: “In general, the soils at the site consist of sands and clays of Pleistocene or early Recent age. The surface deposits are typically early Recent sands and soft clays. Beneath the sands are
Pleistocene deposits of very stiff to stiff clays and medium dense to dense sands.”
Borings went to 160 feet from surface (Figure 1), encountering stronger material than that underlying the George Massey Tunnel replacement bridge site.
The fact sheet states: “Thousands of hours of professional geotechnical and bridge structural engineering have been dedicated to ensuring that the new George Massey replacement bridge and its supports are appropriately designed for the conditions at the crossing site and for a major seismic event.” The Ministry will doubtless have no objection to sharing the reports that this work must have generated.
The bridges cited by the Ministry fact sheet are 4- and 6-lane structures, all founded – ultimately – on a firm bearing layer capable of supporting the weight of the bridge. If a bearing layer, capable of supporting the heavier 10-lane Massey Tunnel replacement bridge, exists within the 335-metre depth from surface exposed by the two boreholes, it is not obvious. The MoTI is planning a heavier bridge than those cited on apparently weaker foundation material.
Assuming that the planned bridge can, in fact, be built, the question remains: “Can it be built for any reasonable cost?” Time will tell.
POSTSCRIPT
That is not the only Delta resident not taken in by Todd Stone and his flunkies. To reward you for reading this far, here is some more debunking
Dear Editor,
Transportation Minister Todd Stone was either sadly misinformed or
lying to the press at the impromptu groundbreaking ceremony held in the
former Delta firehall when he claimed that the proposed bridge replacing Massey
Tunnel is not being built to accommodate Port Metro Vancouver (PMV) since
“large ships aren’t able to turn around in the Fraser River anyway”(1). He
conveniently forgets that the Vancouver Airport Fuel Delivery Project (2) on
the north side of the Fraser River, approved by PMV’s environmental assessment
office, provides a terminal and a 80 million liter tank farm for unloading
Panamax supertankers carrying hazardous jet fuel. That terminal location allows
the jet fuel supertankers to turn around with the help of tugs before they
are escorted out to the Salish Sea. At the recently approved Fraser River Surrey Docks project, Panamax-size coal ships will be loaded and turned around (3). Similarly the LNG terminal location on south side of the Fraser for the LNG supertankers also provides capability for turnarounds (4). PMV initially requested that the air draft of the proposed bridge be raised to 65 m from 57 m to allow taller cruise ships, LNG supertankers and freighters to go past each other under the bridge (5, 6). PMV has since then recommended 59.6 m for a tall single ship passage only.
The removal of Massey Tunnel and replacing it with a high ten lane
bridge and subsequently dredging (7) the river deeper is all in aid of PMV
providing unfettered access for larger ships to go further up river and
thus further industrialize the Fraser River (5) and destroy its habitat and
estuary for salmon fisheries and wildlife (9).
Yours safely,
Jim Ronback,
System Safety Engineer (retired)
Tsawwassen,. BC
P.S. Replacing a four lane tunnel with a 10 lane bridge may not
necessarily reduce one’s travel time if it creates a Braess’s paradox (8)
in the overall transportation network. We need confirmation that this
paradox will not occur.
1) “Stone also categorically rejected the notion the tunnel was being
replaced to accommodate Port Metro Vancouver, which isn’t contributing
to the project, saying large ships aren’t able to turn around in the
Fraser River anyway.”
http://www.delta-optimist.com/news/protestors-try-to-damper-bridge-announcement-photo-gallery-1.14222564
2) Vancouver Airport Fuel Delivery Project
http://www.vancouverairportfuel.ca/
3) “Port Metro Vancouver has approved a revised shipping plan that
would see deep-sea vessels loaded at the Fraser Surrey Docks.
… The new plan involves the same amount of coal—four million
tons a year. But instead of 640 barges, some 80 Panamax-size
ships will be loaded each year. However, a longer ship loader
will be required, and extensive dredging would be necessary so
that there is room in the river to turn the ships around. The ships
are 225 metres in length.”
Revised coal shipping plan approved- Patrick Brown
Island Tides, Volume 28 Number 1 January 14, 2016
http://www.islandtides.com/assets/reprint/coal_20160114.pdf
4) LNG Fraser River export project approved by National Energy Board
The liquefied natural gas would be exported from a facility in Delta, B.C.
http://www.cbc.ca/news/canada/british-columbia/lng-fraser-river-export-project-approved-by-national-energy-board-1.3098376
5) “The port (PMV) has long been an advocate for the Massey Tunnel replacement
because of port-related traffic congestion in the tunnel and the constraints
on deepwater vessel traffic. For years, the port has cited the pre-built
sectional tunnel’s shallow draft as a major impediment to expanding
commercial river traffic.”
Port Metro wants Massey bridge higher to allow biggest LNG tankers, May 22, 2015
http://www.vancouversun.com/Port+Metro+wants+Massey+bridge+higher+allow+biggest+tankers+documents/11072958/story.html
6) Update on George Massey Tunnel Replacement
– City of Richmond, July 10, 2015
http://www.richmond.ca/__shared/assets/_15_Update_GMT_Replacement_Project_Council_07271542046.pdf
7) IMPLICATIONS OF DREDGING THE LOWER FRASER RIVER FOR THE PURPOSE OF
INCREASING COMMERCIAL SHIPPING
– THE RISK TO SPECIFIC INDUSTRIES, SERVICES & FISHERIES, PRELIMINARY REPORT
Trevor Langevin, September 2016
https://metrovanwatch.files.wordpress.com/2016/12/fraser-river-dredge-report-sept-2016-langevin.pdf
8) Braess’s paradox is a proposed explanation for a seeming improvement to a
road network being able to impede traffic through it.
https://en.wikipedia.org/wiki/Braess%27_paradox
9) The Questionable Science of Vancouver’s Port Expansion
A flawed environmental impact assessment may have consequences for the western sandpiper.
by Amorina Kingdon , Published November 28, 2016
https://www.hakaimagazine.com/article-long/questionable-science-vancouvers-port-expansion
Vaughn Palmer: ‘Forces of no’ dig in for tunnel replacement ceremony
There was an opinion piece by Vaughn Palmer in the Vancouver Sun yesterday which did not give anything like a balanced coverage. The protest is against spending far too much money on a “solution” that we know will not work. Not against doing something about people currently experiencing long delays to get through the tunnel at some times of day. Groups like Fraser Voices have been concerned that the bridge was decided on in the Premier’s office – and all the effort since then has been to justify a quixotic choice. All the other options – including sticking to the BC Liberals’ previous plan – are simply ignored. And then they lie about the port’s intentions to deepen the ship channel.
So I wrote a Letter to The Editor. I am putting this out here now because I think it is very unlikely to be published.
Vaughn Palmer’s characterization of the protest at the tunnel ceremony is not accurate. There are real alternatives to the $3.5bn vanity project that have not been adequately examined.
The real problem is congestion at peak periods. Traffic through the tunnel has actually been in steady decline for the last ten years. However, the Port of Vancouver operates the container terminal on bankers’ hours. Monday to Friday 8am to 4pm. No other port operates like that. It ensures that truck traffic uses the tunnel at peak periods, and makes the congestion worse. That is deliberate. It helps the port make the case for tunnel removal. There are plenty of records available that demonstrate the Port’s long term strategy for deepening the dredging of the channel – and the tunnel prevents that. In the short term, simply banning trucks at peak periods – and opening the container collection and delivery facilities 24/7 – will relieve the present problem.
In the longer term, congestion can never be solved by widening roads. Never has done, never will do. All that does is move the line-up to somewhere else. The only way to reduce car traffic is to increase transit service. One bus can carry many more people in a given length of road than cars can. The province has already invested in bus lanes both sides of the tunnel but service needs to be increased. And when that isn’t enough, add another tube on the river bed carrying light rail.
As for the claim that the “full freight will be covered by tolls”, it has not worked for the Port Mann or the Golden Ears. Why would the Massey replacement be any different?
Fact Checking Todd Stone
Susan Jones is a very diligent researcher, and a great source of information in matters pertaining to the Massey Tunnel Replacement Project. She circulated the following bunch of clippings to the Fraser Voices group. I thought that my readers would appreciate the following and I encourage them to spread the word.
Letter in Richmond News quotes B.C. Transportation Minister, Todd Stone, October 25, 2016
“And let me be clear – there are no plans to dredge the Fraser River.”
Richmond News: Letter: Tunnel twin more expensive, less safe says Stone
There are definitely plans to dredge 34 kilometres of the Fraser and the BC Government has been involved in the planning. It is the $90 million Fraser River Channel Deepening Project to dredge the navigation channels from 11.5 metres to 12.8 metres.
One source of information is found on the Corporation of Delta website.
March 31, 2015 Report on: Gateway Transportation Collaboration Forum
A letter from the Gateway Transportation Collaboration Forum to BC Government and specifically to Todd Stone: (scrolled pages 4 and 5/49)
“Thank you for your letter dated February 2, 2015, providing support to the Gateway Transportation Collaboration Forum (GTCF) and direction for us to work with your recommended staff.
We are pleased to provide an update on the progress of the GTCF. The Steering Committee and Working Groups have been actively engaging with municipalities, First Nations and stakeholders to identify
potential gateway-related infrastructure projects of national significance in Greater Vancouver.
…
The British Columbia Ministry of Transportation and Infrastructure (MOTI) is participating on the forum to understand various stakeholders’ interests and support coordinated gateway planning and infrastructure development…”
Scrolled Page 17/49 – note BC Government logo at top of page
Fraser River Channel Deepening Project
Capital Dredge of the Fraser River to 12.8 m to the 34 km mark
- A material enhancement project to increase the depth of the Fraser navigation channel, from km 0 to 34, from its current draft of 11.5 meters (m) tidal to to 12.8 (m) tidal assist.
- The Project will allow vessels currently calling the Fraser River to be loaded to their maximum capacity and to accommodate increased vessel draft for new growth opportunities and market demands. Increases the capacity of the two navigational channels.”
Potential Applicant: Fraser Surrey Docks LP* (* Private sector projects pending confirmation of public-sector partnership)
Estimated Capital Cost: $90 million
Development Status: Concept Design
Potential Beneficiaries: Port Metro Vancouver, Private Sector, Canada, Province, Metro Vancouver, municipalities
Groups Call on Feds to Fund Transit, not Massey Bridge
Press Release from The Wilderness Committee and Fraser Voices
Open letter urges government to review project and consider alternatives
RICHMOND, BC – Community and national organizations are calling on the federal government to launch an environmental review of the proposed Massey Tunnel Replacement Project and to withhold federal infrastructure funding from the project.
Resident group Fraser Voices, the Wilderness Committee, Council of Canadians and five other organizations representing over 160,000 members and supporters have sent an open letter urging the federal government to use the money it has promised for infrastructure to fund transit projects in Metro Vancouver instead of the new 10-lane highway bridge.
“This federal money gives Canadians an opportunity to correct the mistakes of the past and build a greener future,” said De Whalen, one of the founding members of Fraser Voices. “But the Massey Bridge is imposing the same old car culture from the 1950s.”
The federal government has said it will fund environmental and social infrastructure with its $10 billion per year stimulus money. Extra vehicles resulting from the Massey Bridge and will add about seven million tonnes of carbon dioxide to the atmosphere over 50 years.
“It is irresponsible to be building new highways during a climate crisis, especially when they do nothing to ease congestion,” said Peter McCartney, Climate Campaigner for the Wilderness Committee. “Even the mayor of Houston, Texas – with its 26-lane freeway – agrees it’s time to stop building highways and build transit instead.”
Community groups are hoping the federal budget next week will include funding for the Broadway Skytrain project and Surrey LRT instead. Along Highway 99, rapid bus service could ease congestion for a fraction of the $3.5 billion price tag of the proposed Massey Bridge.
Open letter to Prime Minister Justin Trudeau, Mar. 17, 2016