Stephen Rees's blog

Thoughts about the relationships between transport and the urban area it serves

Posts Tagged ‘Sound Transit

“TransLink expands Metro Vancouver bus service by 105,000 service hours”

leave a comment »

artic-unloads-at-bridgeport

The headline comes from a Vancouver Sun article. There is not much in the way of context – other than two previous announcements of smaller increases earlier this year and a reference to the Mayor’s plan for expansion.

So I went to the Translink web site and dug out the 2016 Transit Service Performance Review which informed me that last year Translink delivered 3,897,000 bus service hours, which was a 1% increase on 2015 – which is also the compound annual growth rate for the last five years.

Which means that was has been announced is a 0.02% increase in bus service, if we assume that all these quoted figures are annualised.  And, of course in 2017, it is less than that since these new service hours will only be delivered in the last quarter of the year.

So good, that we are getting more bus service in this region. But the rate of population growth is “6.5 per cent since the last census in 2011” (also a Vancouver Sun report, but of census data). So we are only just keeping pace with the increase in the number of people, let alone making a bigger impact on transportation trip making (“mode share” in planning jargon).

So one cheer for Translink and raspberries to Postmedia for simply printing a press release without any analysis.

We must commit to a much faster increase in transit use – which means more service hours for buses, more transit services of all kinds and much more priority for buses operating in traffic – which is most of them, most of the time. Just to give you some idea of what the plan needs to look like, take a gander at this new expansion map for Sound Transit.

Translink now has the details of the September sheet change online

Written by Stephen Rees

August 22, 2017 at 1:38 pm

Posted in transit, Transportation

Tagged with , ,

Some Sound Transit light-rail screeches just won’t stop

with 21 comments

Seattle Times

Just to raise the sights a little, light rail, often promoted here as the solution to all our transit concerns, is proving far from problem free in Seattle. Noise is a serious issue – and they are working hard to do something about it.

Surface light rail does have impacts on its surroundings. Indeed, it would be foolish to think that any technology has no impacts at all. Wind farms look very good in comparison to off shore oil wells these days, but are still a threat to birds.

While I do not recall there being very many public outcries against the noise of our rapid transit, the one that bothers me as a reasonably frequent passenger is the squeal on the Canada Line as it winds its way around the granite outcrop underneath Queen Elizabeth Park. Initially I thought this might get better as the track was conditioned – or through a combination of wheel turning and rail grinding. I cannot say I have noticed any improvement. That did seem to work at some places in Seattle – but not all of them

Rail grinding last winter improved the sound on much of the line but loudness inexplicably increased near the river

They are also going to to try flange lubricators

Transit contractors installed lubrication machines to reduce screeching on curves. The biodegradable gel automatically is squirted on the rails, where wheels pick it up and spread it near Mount Baker Station. The lubrication is helping somewhat, and Gray said one lube point will be moved closer to the Beacon Hill Tunnel soon.

Since the squealing only occurs inside a tunnel there are no neighbours to annoy, and I suppose that users of the Canada Line are expected to simply tolerate it. It does not happen on SkyTrain since the trucks under the cars have steerable axles. I don’t think that is an option with conventional traction motors which tend to be hung on the axles on most electrical multiple unit trains. But I would also think that since the noise is created by metal grinding on metal that is must have cost implications in track and wheel wear too.

Canada Line nb tunnel under False Creek

Written by Stephen Rees

June 7, 2010 at 12:04 pm